Bridging utility delays to commission a hyperscale data center

Facing extended utility grid delays, a hyperscale data center risked missing critical commissioning milestones and delaying operations. Aggreko delivered a 60 MW turnkey temporary power solution with built-in redundancy, advanced fuel management, and real-time system control. The engineered approach enabled on-schedule commissioning, protected return on investment, and established a repeatable model for hyperscale development under grid constraints.

Client
Hyperscale data center developer
Location
South Bend, Indiana, USA
Sector
Data centers

Overview

The challenge

Utility constraints threatening commissioning and speed-to-market

The solution

Turnkey, engineered temporary power at hyperscale scale

The impact

Protecting ROI while maintaining project momentum

60 MWTOTAL TEMPORARY POWER DEPLOYED
99.1%UPTIME ACHIEVED OVER A 6-MONTH OPERATION
1-monthNOTICE WINDOW TO MOBILIZE A FULL SOLUTION