testing the endurance of a hyperscale data center

Testing the endurance of a hyperscale data center

Testing the endurance of a hyperscale data center

  • The Challenge

    Pushing the limits - from simulations to real world scenarios

  • The Solutions

    Dynamic solutions for ever-changing requirements

  • The Impact

    Downtime risks eliminated, data center commissioned

Client: Hyperscale data center provider

Location:Tokyo, Japan

Sectors:Data centers

The Challenge

Pushing the limits - from simulations to real world scenarios

Our client was in the testing and commissioning phase of their new hyperscale data center in Tokyo, Japan. As data centers require a consistent and dependable power supply, emergency generator units are essential to ensure uninterrupted operations in case of power outages or other unexpected events. Testing emergency generator units is a crucial step in commissioning a new data center and ensuring its readiness for full operation. Given the tight timeframe to successfully complete the tests, the client sought Aggreko’s expertise and flexibility to find a solution quickly. They needed both loadbank equipment and personnel, and trusted our reliable modular approach.

However, the challenge became even more complex as the client required us to test multiple scenarios and a high total load, as well as change the LV cables after every test.

3 x 2,300emergency generators tested
2,300total load test
4.2of LV cables
1 x 3,300loadbank

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...