Keeping critical campus operations on through a cooling emergency

Client
Higher education facility
Location
Wisconsin, USA
Sector
Education, Government

Overview

The challenge

A cooling failure put critical operations at risk

The solution

An engineered cooling network built for continuity

The impact

Protecting research, occupancy, and essential operations

8,000 TONSTEMPORARY COOLING CAPACITY DEPLOYED
16 MWPOWER SUPPORTING THE COOLING SOLUTION
3 WEEKSFROM DEPLOYMENT TO FULL INSTALLATION