The challenge

Taking a turbine offline for control system upgrades left an offshore platform running on a single primary turbine. The company needed a standby power solution that could fit tight space/weight limits and tie into existing medium-voltage infrastructure.

The solution

Aggreko delivered a 2.5 MW dual-generator package (1,500 kW + 1,000 kW) that stepped up to the platform's 5 kV system, complete with isolation gear, overload protection, and full engineering and commissioning support.

The impact

The standby system allowed the customer to complete the turbine upgrades safely, reducing operational risk and keeping offshore production running without interruption.

2.5 MW Offshore contingency energy solution
5 kVMedium-voltage termination point
MultiMegawatt medium-voltage power system provided