Welder mounts in the trunk pipeline electrochemical protection

Gas power ready to go in just 1 day for multiple project sites

Gas power ready to go in just 1 day for multiple project sites

  • The challenge

    Power for a Pipeline Inspection and Maintenance services team in remote European locations

  • The solution

    1 MW Gas Generators adjusted specifically for each project to run on pipeline gas available at each project site

  • The impact

    Cost savings directly reduce customer’s cost base to become cost competitive while reducing their environmental impact

Client:Global oil services company

Location:Netherlands

Sectors:Oil and gas

Loading component...

1MWGas generators solution
Gas skidFrom 6 Bar to 200 mBar
1 dayInstallation, commissioning of the gas solution
3 YearContract duration

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...