Aggreko quickly drew together a plan that would deliver a suitable solution while meeting the demands of Dormac to ensure that delivery time was met.
Four 100 kW direct expansion packaged air conditioners were taken to the site and installed. Due to their small footprint and mobility advantages, they were installed promptly and were in operation within two days.
The units pushed 100% fresh air at 12 ºC higher temperature into the tanks that needed drying. With 5 m3/s of warm dry air filling the tanks via flexible 500mm ducting, this provided the complete refurbishment. Being ahead of schedule had financial benefits too. The success of this project was down to the expertise from Aggreko and a proven track record of delivering success in the industry. removal of condensation on the inner tank surfaces.
A dry tank meant that the refurbishment could continue and that the resins that were needing to be recoated during the upgrade could dry safely which allowed staff to continue work in the confined space.