  • The challenge

    Keeping critical loads online during a turnaround

  • The solution

    Quick mobilization of temporary power and switchgear

  • The impact

    Zero interruptions and reduced emissions

Client:Petroleum refiner

Location:USA

Sectors:Petrochemical and refining

The Challenge

Keeping critical loads online during a turnaround

One Midwestern refinery needed to perform a replacement of their existing 480V motor control center (MCC), however this would require two days of downtime for the refinery and potentially hundreds of thousands of dollars lost in revenue. They knew they would need critical loads to remain online without interruption while replacing the switchgear, but they weren’t exactly sure how to make that happen. Additionally, tight worksite space limited the number of generator sets requiring a balance against competing objectives.

2Diesel generators
ZeroDowntime
24/7Technical support

Loading component...

The Solution

Quick mobilization of temporary power and switchgear

Our electrical experts conducted site walks to better understand the space restrictions and quickly designed a solution to fit the exact project specifications. Over the course of just 14 days, from the initial project discussion to startup, we mobilized two temporary generators and the necessary switchgear to keep the processing unit running during the turnaround phase. Our onsite technicians provided additional workforce to ensure the transition was executed perfectly, resulting in zero downtime for the customer.