Using their experience gained
from working on vast numbers
of turnarounds, Aggreko’s expert
consultants designed a complete,
innovative solution that met all
the customer’s requirements.
Working together with the
plant’s electrical engineers,
they developed a power plan
that used our tier 4 Final
generators to support substation
maintenance and planned
outages, as well as power and
distribution for critical heat
treatment applications.
100% oil-free dry air was
supplied to the flare, olefins,
instrumentation, and nitrogen
booster. Air conditioning
packages were installed in
tents and facilities to ensure
safe and comfortable working
conditions for staff.
In total, we provided 14.2 MW
of power, 270 tons of temporary
cooling, and 28,000 CFM of
oil-free compressed air.
Since there was a large
amount of equipment being
moved around at different
times, we assigned a dedicated
project manager to ensure
that the operation was as
smooth as possible.
This meant that all equipment
was always in the right place at
the right time. The customer
had just one point of contact for
turnaround management, which
made it easy to flag and resolve
queries quickly.
As the final touch, 24/7 remote
monitoring ensured the
equipment was always running
at optimal performance.