Aggreko cooling tower services (ACTS) team arrived onsite to assess the damage and review all technical details in order to provide proper project management that would work seamlessly with the plant’s managers. Aggreko shipped 60,000 tons of cooling tower capacity, over nine miles of cable, six 1.3 MW natural gas generators, three 1500 kW diesel backup generators, and associated electrical distribution and diesel tanks. Within six days of the go-ahead, Aggreko had all 12.3 MW of power on line and 30,000 tons of cooling tower capacity up and running. Although 60,000 tons of cooling capacity were shipped, only 30,000 tons were installed due to engineering calculations ensuring a lower amount would be enough. Aggreko kept the spare cooling capacity onsite and available if needed.