The challenge
Hydro One required a temporary power solution to maintain reliable electricity to communities during planned maintenance
Hydro One required a temporary power solution to maintain reliable electricity to communities during planned maintenance
Aggreko deployed a 2.5 MW temporary power solution that kept customers online during planned hydro plant and transmission maintenance
Maintained uninterrupted power to customers while allowing critical maintenance to be completed safely and on schedule
Each year, Hydro One, Ontario, Canada’s largest electricity transmission and distribution provider, works with a major hydroelectric company to schedule dam maintenance outages so critical work can be completed safely without interrupting power to the communities served by the distribution line.
During these outages, the transmission circuit needed to be taken offline for maintenance. Electrical, substation, structural, and underwater dam inspections were also undertaken. Because the generators supply a long distribution line serving schools, residential customers, and remote communities, a temporary power solution was required to keep customers online. The remote location also required equipment to be installed several kilometers away and integrated into the existing medium-voltage network.
Hydro One partnered with Aggreko to provide an engineered temporary power solution that allowed the distribution customer load to remain online while the hydro plant and transmission circuit maintenance activities were completed.
Aggreko installed approximately 2.5 MW of temporary diesel generation, and integrated them into a 25 kV distribution system, allowing power to continue being supplied to the distribution feeder during the planned outage. Aggreko managed installation, commissioning, and operation of the temporary system and has supported this annual maintenance outage over multiple years, acting as a reliable partner for planned maintenance and outage support.