Data center energy solutions

Large-scale, uninterrupted power for data centers: beyond grid dependence

Power your data center on your schedule. Not the grid's

Behind-the-meter power from 1 MW to 100+ MW. Engineered, installed and operated by a single partner. Construction, commissioning, bridging or long-term prime power, under one contract.

Interconnection is the long pole. It doesn't have to be

Grid connection delays your projects, but they don't have to. The US grid struggles to meet the 90 GW demand from AI workloads, and regulations now mean you fund your own power infrastructure. The result is always the same: your data center is ready, but the power isn't. 

We close that gap. Our on-site generation powers you immediately, letting you energize, commission, and operate. You stay on while utility capacity catches up, ensuring continuous power without interruption.

Loading component...

Your data center power: one partner, every phase

Your data center needs power from day one. The grid often arrives late, covering only part of your load. 

We deliver on-site power for your entire project lifecycle, acting as your single partner through every phase. 

We power your data center from construction to long-term operation. Energize your build, scale with demand, and commission safely with redundant power. Bridge utility gaps for any duration. We deliver flexible, off-grid, or hybrid solutions for long-term prime power.

Loading component...

Powering data center growth beyond the grid

Data centers need reliable power, always. We design, deploy, and optimize engineered energy solutions for every stage: construction, commissioning, and long-term operations.

From 30 MW for critical commissioning to 60 MW for large-scale projects, we've deployed over 100 MW to power data centers across all these phases. We bridge critical gaps, provide temporary and phased energy, and ensure continuous operation. Our expertise in natural gas and diesel keeps your data center on, no matter the challenge.

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...