Power supply to meet growing demand in Peru

Power supply to meet growing demand in Peru

  • The challenge

    Act quickly to generate power and support productive growth.

  • The solution

    Power and logistics solution delivered in record time

  • The impact

    Power and productivity for the entire region.

Client:Power distribution company

Location:Trujillo, Peru

The Challenge

Act quickly to generate power and support productive growth

Peru's national power grid was facing a significant increase in energy demand within its concession area, leading to delays in transmission network and substation upgrades.

There was an urgent need to generate power at a critical distribution point to prevent shortages and sustain the region's productive growth.


19 MW – 22.9 kV of contracted capacity
19 generationunits installed
14-monthcontract

The Solution

Power and logistics solution delivered in record time

Aggreko proposed and implemented athermal generation solution with a total capacity of 19 MW. The project included not only power supply but also full operational management, ensuring efficient and uninterrupted performance.

Equipment was strategically transported from Panama and Chile, showcasing Aggreko's logistical capabilities to rapidly mobilize resources.