Working closely with the Las Vegas Grand Prix team as the Official Temporary Power Partner, we designed and built a meticulously engineered temporary utility solution to provide power for the night race.
The setup included 34.6 MW of power, 14.2 million BTUs of cooling, and 4.1 million BTUs of heating, ensuring seamless operation across critical areas. We deployed a total of 110 low emission tier 4F generators – engineered to meet the highest emission standards, providing reliable energy and redundancy while significantly reducing local emissions.
We paired the generators with battery energy storage systems (BESS), enabling automatic switching between generator power and battery energy. This minimized fuel consumption, lowered emissions, and improved reliability even further, giving the team much-needed peace of mind that the event would maintain the power it needed to deliver an excellent experience.
We also provided electric air conditioners and heaters, keeping guests comfortable, all while minimizing emissions.
Most importantly, we powered critical track lighting – crucial for keeping the event illuminated for a dramatic nighttime race – in 16 different positions with power from multiple 300 kW generators, as well as HVAC solutions at many locations, including VIP hospitality and Skybox suites, grandstand, the Paddock, Neon Garden, and much more.