Full offshore platform commissioning support

Full offshore platform commissioning support

  • The challenge

    Temporary power and cooling for offshore platform commissioning

  • The solution

    Complete package to cover all the requirements of the commissioning project

  • The impact

    Platform commissioned on time with no need for additional suppliers

Client:Multinational oil and gas company

Location:Ingleside, Texas

Sectors:Oil and gas

The Challenge

Temporary power and cooling for offshore platform commissioning

A new offshore platform had been manufactured in Korea and was then sent to Ingleside, Texas to be commissioned before being deployed in the Gulf of Mexico. The operator required a temporary solution for power and cooling for their equipment and staff during the commissioning project until the platform was ready to be deployed at sea. They had a tight deadline they were working to when the platform had to be operational so it was critical that all the necessary commissioning and testing work was completed on time.

1,500 kWGenerator power
24Dehumidifiers
3.25 MVLoadbank package
7 monthsOnsite with 24/7 support

Loading component...

Loading component...

The Impact

Platform commissioned on time with no need for additional suppliers

The customer was able to complete all the commissioning and testing in time to get the platform into the Gulf of Mexico and operational on schedule. Partnering with Aggreko meant they could take advantage of our wide range of equipment to cater for all their commissioning needs rather than having to bring in separate suppliers for different aspects of the project.