Data Centre Commissioning Data Centre Commissioning

Our team of data center commissioning specialists partner with contractors, owners and operators for comprehensive load bank testing that ensures continuity and reliability.

Before a data center goes live, you need to be certain that it can rely on its critical infrastructure, no matter what. This includes load testing your data center power, as well as heat load testing your cooling systems and chillers. We provide remote testing across the full range of test levels: from L1 factory acceptance tests to L5 integrated system tests. All with full documentation for your auditing and reporting process.

Data center commissioning testing from Aggreko enables you to:

  • Safely assess your entire power and cooling system
  • Uncover issues and resolve them before you become operational
  • Go live with confidence that your critical infrastructure is ready

With Aggreko, extra comes as standard

What makes Aggreko different is our deep knowledge of data centers, your operations, and how you can respond to rising demand and competitive pressures.

Extra innovation

With green, efficient technology for data centers.

Extra expertise

Extra expertise

From our global network of data center specialists.

Extra reassurance

Extra reassurance

With robustly tested, reliable power, HVAC, and dehumidification.

Extra flexibility

Extra flexibility

With scalable, modular equipment and a responsive global service.

Critical testing for every aspect of data center commissioning – covered

For new data centers, ensuring that comprehensive testing has been undertaken on all critical infrastructure is one area that cannot be compromised on.

Commissioning is a critical phase of the data center lifecycle, and testing at this stage should include:

Incoming MV electrical distribution down to rack-level power, from 20kV switchgear to AC or DC power distribution units

Transformers, uninterrupted power supplies (UPS), and stand-by generation

Mechanical cooling including water cooled towers, chillers, free cooling solutions down to the DX & CRAC units within the halls

Heat loads to perform the integrated systems test (IST)

Partner with Aggreko for data center solutions

Data center load bank testing solutions

  • Load bank testing across five data center commissioning levels (L1-L5), carried out remotely via a hand-held device or using a laptop that utilizes our testing software. We conduct precise tests with less personnel and time, while delivering improved load reliability for your critical infrastructure. We also provide full load test documentation for quality auditing purposes, including method statements and schematics.
  • Power testing using load banks, diesel generators, and LV/HV power generation to test your generators, UPS, busbars, and switchgear. Our load banks offer leading and lagging testing, ranging from 230 kW to 6,300 kVA.
  • Heat load testing to emulate the electrical IT load and heat output for your cooling systems. From water-cooled load banks to 2-4 kW rack-mounted emulators and mobile 200 kW load banks, we stock heat load equipment designed for data center applications.

Temporary equipment for data center testing and commissioning

Aggreko’s Greener Approach to data center commissioning

At Aggreko, we’re committed to offering the latest technology and expert services to support our customers in their transition to a greener future. And that commitment starts at the very beginning of your data center’s lifecycle – including during the commissioning phase.

Our data center power and HVAC solutions are all designed to increase efficiency while lowering environmental impact.

With rightsized solutions and industry-leading equipment, you can ensure that every test is run with your sustainability goals in mind, allowing you to:

Reduce your fuel consumption and costs

Reduce harmful emissions
(CO2, NOx, PM)

Reduce noise pollution

Ensure reliability and efficiency

Aggreko

  • Our Tier 4F diesel generators work in the same way as the cleanest car engines, limiting carbon monoxide, nitrogen oxides, and particulate matter to provide efficient power for use in ultralow emissions zones.
  • Our battery energy storage systems (BESS) are designed to deliver the ultimate in performance efficiency. These are ready-to-install energy solutions with everything included in a standard container, including inverters, HVAC, fire protection, and auxiliary components. All are tested by our experts and operated by the smartest software on the market.
  • Our hybrid power plants include a battery paired with a low-emissions or gas generator, meaning fuel is only used when it’s needed most. During non-peak hours or at night, the generator turns off and the battery provides power – ideal for welfare structures, lights, and security systems. They are also fully automated and require minimal maintenance.

Why do data centers partner with us?

From hyperscalers to edge data center operators, we’ve helped customers around the world test their equipment and go live with confidence.

Global reach

A network of engineers spanning 100+ countries – giving you access to global expertise and accurate testing, anywhere.

24/7 remote monitoring

With Aggreko’s Remote Monitoring service, we’re always here to identify and resolve issues with testing equipment like load banks.

Greener and leaner

Our load banks are all designed for efficiency, with a range of capacities so you can rightsize your installation.

The widest choice

For data center load bank testing, we provide a comprehensive range of options – from compact 100 kW units to 6,000 kVA load banks for high-pressure tests.

Experts in data center testing

We’ll use our hands-on experience to make your testing manageable, from developing a test plan and preparing your load bank to conducting the entire test remotely.

Standardized fleet

We’re the only temporary equipment provider on the market with a standardized fleet – giving you fast installation and consistency you can count on, everywhere.

Read about our success stories in North America

FAQs about Aggreko’s data center testing and commissioning

Uptime and availability are key to success in any data center – but it can be difficult to be certain about performance until your data center power and cooling equipment is under pressure. When demand spikes, you need to be sure your equipment can cope. A load bank gives you a way to put your equipment under a fixed load and test how it performs – a key part of data center commissioning.

In general, the more test points you have along the path of your data center commissioning the better. Global frameworks for testing include five distinct levels, each offering its own check:

  • Level 1 testing in the factory where equipment is made
  • Level 2 testing to check equipment has arrived safe and intact
  • Level 3 testing to check installations before equipment is powered up
  • Level 4 testing to check individual pieces of equipment under load
  • Level 5 testing to assess how equipment works together under load