  • The challenge

    Implement a fully networked load bank solution for level four and level five testing

  • The solution

    Every load bank was individually labelled and assigned into groups according to the designed plan

  • The impact

    The project was delivered on time and budget

Client:Global Data Center Hyperscaler

Location:North America

Sectors:Data centers

The Challenge

Implement a fully networked load bank solution for level four and level five testing

The electrical contractor was very involved in the project because the customer has a stringent quality control process. It was critical to the project team that the load bank network have extensive heat load shifting capabilities. Aggreko was tasked with developing a load bank networking plan that would execute the full scope of the commissioning agent’s plan.

  • Scope project to gain in-depth understanding of the data center, testing requirements and previous issues
  • Review the commissioning plan to provide engineered drawings that overlay with the commissioning plan/load bank layout.
  • Installation of load bank solution with independent power source.
  • Ensure no costly delays or impacts to testing schedule.
80 x 500 kWload banks complete
2 x 4 MWdata halls networked together
90- daysequipment footprint
120 power source